Client
City of Darwin
Budget
-
Workforce
3
Time Line
7 days

Hardy Landscaping were the successful tenderer engaged by City of Darwin to demolish an outdated playground that was passed its use-by date. We replaced it with a modern playground.

Particular criteria had to be met, such as climbing nets, swings, slide and a rock wall. We were able to design and propose an Activity Box and Swing Set. These options met the criteria and offered something that hasn’t yet been installed in a City of Darwin neighbourhood park.

We used a subcontractor to undertake the demolition and excavation works. All other tasks were completed by the Hardy Landscaping team. These included footing excavations, installation of equipment, installation of shade structure, installation of kerb, installation of softfall and rehabilitation including irrigation adjustments.